Robertsbridge & Burwash
23 June 2017

Work is being carried out to clean water mains in the Robertsbridge and Burwash areas  to safeguard the quality of drinking water.
It is part of maintenance on South East Water’s underground mains and will take place in postcodes TN19 and TN32

What is flushing?
Flushing allows naturally occurring harmless deposits inside the network – such as iron or manganese – to be removed.  While these naturally-occurring deposits are not harmful, they can temporarily discolour the water.

Why do we use this method?
Flushing the water mains from the start to finish of the network – from service reservoirs, which store fully treated drinking water, to the point at which it supplies customers – is a very effective way of cleaning the inside of water mains.

How is flushing carried out?
Flushing involves directing water through the pipes quickly to draw the sediment deposits –out of the network. Once the water reaches its journey’s end, the flushed water containing these deposits is directed into the drains. We are careful to only use the amount of water needed to clean the pipes and flushing stops as soon as the whole system is running clear.

Will flushing affect my water supply?
During the flushing process customers may notice a reduction in water pressure, and possibly some discolouration, but this is temporary and can be solved by running the kitchen tap until the water runs clear.

Flushing will take place in the following areas from Monday 3 July for approximately two weeks.
Week 1
Borders Lane
Etchingham Road
Glebe Corner
Glebe House
Greenfield Road
High Street
Ludpit Lane
Oaks Close
Oxenbridge Lane
Park Farm Close
Straight Mile


Week 2
Bellhurst Road
Brightling Road
Bugsell Lane
Ellenwhorne Lane
Glenleigh Walk
Green Hedges
Hackwood
Knelle Road
Langham Road
Ludpit Lane
Oakland Drive
Oxenbridge Hill
Robertsbridge Road
The Spinney
Weald View
Willards Hill

Aa